Manufacturing of Rifey and Кondor vibrating presses. Rifey Concrete plants

Official Website

Industrial management

Industrial management for the equipment by Stroytekhnika Plant

Rifey technical complexes are perfect for use in the settlements of rural areas. Rifey lines are compact, yet functional product lines intended for the production of building materials. They compare favorably with expensive foreign equipment, the use of which outside the city limits is economically inexpedient. The use of imported production lines greatly increases the cost of the finished product, which has a negative impact on the supply level, the possibility of concluding contracts and the sale of products to consumers.

Competent industrial management as a way to optimize the manufacturing of building materials

To improve the production process, the customer may choose an appropriate line from the Rifey lineup. The choice should be determined by the specifics of the area, where the production line will be located, and the nature of the products that will be manufactured.

Sand required for industrial management is recovered from a quarry located close to the place of line installation. Equipment is delivered to the installation site using the vehicles; the manufacturers selected the source of electric power, the power of which should be 15-35 kW. After that, it is necessary to organize the delivery of cement to the production site.

Typically, industrial management in rural areas requires special facilities, in which the equipment will be located. However, if you open a complex in the summer time, you can install it under a shed and then proceed with the construction of the production facilities..

Industrial management for Kondor compact equipment

Кондор_схема.jpg

Kondor compact equipment allows starting production of construction products within a short time. Maintenance requires just two employees, who may be ordinary people - workers without qualification and technical education. The plant can be operated either outside or inside.

Example of industrial management with the use of two brick making machines based on Bikondor

Бикондор_схема.jpg

The use of two brick making machines allows accelerating the production process even with the minimum number of employees - 3 persons. Two different matrices can be installed on two brick making machines, which will simultaneously produce two different types of products, such as paving slabs and curb stones.

Industrial management for Trikondor equipment with three brick making machines

Трикондор_схема.jpg

Trikondor machine is compact and simple. However, it has a distinct advantage - it can help to organize the simultaneous release of several types of construction products – for example, wall blocks of various shapes or curb stones and paving slabs. Three brick making machines, working simultaneously with different matrices, will produce 3 times more products than the complex with one brick making machine. Besides, you do not have to waste time on the replacement of matrices.

Example of industrial management with a minimum mechanization level based on Rifey-04

primer1.jpg

Rifey-04 allows you to start the production with a minimum number of employees. Only 5 people are enough to service the line. This equipment is compact and can be located either outdoors or indoors.

Industrial management for Rifey-Udar – equipment with a high mechanization level

Удар.jpg

Powerful Rifey-Udar line is designed for a full-scale rapid production of concrete building products. Despite high performance, Rifey-Udar can be served by only 5 employees who have been trained for work on this equipment and are not experts with secondary vocational or higher education. This equipment allows to produce high-quality concrete products.

Example of industrial management with minimization of manual labor based on Rifey-Buran

БУран_2.jpg

Rifey-Buran line can be serviced by only 6 people. Nevertheless, it can be compared with the production plant. Automatic line eliminates the notorious human factor. Automatic dismantling of pallets for ready-made stones loading reduces production time.

qwestion
qwestion
Submit application
* - required fields
Request a call back
* - обязательные поля
Detailed calculation
* - required fields
Ask a question
* - required fields